Customization: | Available |
---|---|
Casting Method: | Sand Casting |
Casting Form Material: | Metal |
Still deciding? Get samples of US$ 100/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Material | 45#,WCB, WCA, WCC, ISO 340-550, etc. As customer request |
Manufacturing Process | Investment casting, option Lost wax casting |
Casting Tolerance | CT4-8 for Cast Steel Anvil |
Machining Process | CNC Machining/ Lathing/ Milling/ Turning/ Boring/ Drilling etc. |
Machining Tolearnce | Up to IT7, Ra 0.8~3.2 , according to customer requirement |
Surface Treatment | Surface Passivatin, Polish. As customer requests. |
Package | Multilayer wooden box/pallet, with big plastic bag inside |
Lead Time | about 45 days for Cast Steel Anvil |
Qingdao Ruilan Trading Co., Ltd. is located in Qingdao, Shandong Province. Our company is modern enterprise which specialized in Casting Forging Welding and Machining for Agriculture Industry Construction Mining and Forestry. Ruilan is rich in production experience, advanced management concepts and standardized management system and strong technical force, the company is fully capable of performing a variety of different specifications of products design and production process.
Q:Why choose Ruilan?
A:
1) Ruilan: an experienced loader manufacturer with over 15 years.
2) Ruilan Team: customers-focused,you'll get reply within 5 minutes.
3) Ruilan : premium quality with reasonable price.
4) Ruilan : CE and ISO9001:2008 varified.
Q:What is Ruilan warranty?
1) After-sales: one year warranty.
2) Ruilan proposal: Easy Maintenance.
Q:What about delivery term?
30-45 days after down payment received.
Q:What about the payment term?
30% advance payment, 70% balance by T/T.